Construction Scheduling Practices and Techniques

July 9

Ignoring the time management portion of projects leads to delays, busts budgets, and kills profits.

Just as a bid is an estimate of the costs needed to construct a project, the schedule is an estimate of the time needed to construct a project. The first step of properly managing your project time is planning your project and then working your plan. In order to manage your project using the project schedule, you will need to ensure that the project schedule represents your construction plan. Properly managing your project time also includes managing project risks, added work, changes to the project, and dealing with unanticipated events. The benefits of this timely topic include an experienced instructor who can provide the perspective of both the contractor, who is typically responsible for developing and updating the project schedule and the owner, who is typically responsible for reviewing and accepting the project schedule and evaluating requests for additional time. We will also discuss how project schedules are used and misused to support a party’s position.

Learning Objectives

  • You will be able to explain why a construction schedule is an essential project management tool.
  • You will be able to describe how a baseline schedule is developed.
  • You will be able to discuss how to use the project sample to demonstrate entitlement to additional time.
  • You will be able to identify construction scheduling best practices, tips, and abuses.

Purchase Options

Add to Wishlist

More Program Information

Why Lorman?

Over 38 years and 1.4 million customers worth of experience providing continuing education. Our passion is providing you world-class training to help you succeed in business and as a professional.

Agenda

Construction Scheduling Basics
  • What Is a Schedule?
  • Why Are Schedules Necessary?
  • Who Is the Scheduler?
  • Different Scheduling Techniques
  • Critical Path Method (CPM) Scheduling
Essential CPM Scheduling Information
  • Data Date; Durations
  • Logic Relationships
  • Calendars; Activity Dates
  • Forward and Backward Pass
  • Float - Total Float, Free Float, and Negative Float
  • What Is the Critical Path?
  • Constraints; Cost and Resource Loading
How to Build a Project Schedule
  • What Is the Baseline Schedule?
  • Planning vs. Scheduling
  • Development: Top-Down or Bottom-up
  • Sequencing; Durations
  • Coordination; Recommendations
Updating the Project Schedule
  • Why Is the Project Schedule Updated?
  • How to Update the Schedule?
  • Progress vs. Revisions; Making Changes
  • Revised Schedules; Recovery Schedules
  • Recommendations
Time Extension Requests
  • Using the Project Schedule to Demonstrate Entitlement to Additional Time
  • Time Impact Analysis
  • Preparing and Evaluating a Request for Additional Time
Scheduling Best Practices and Abuses
  • The Project Schedule Is Project Management Tool
  • As-Built Logic Changes
  • Misused Scheduling Software Features
  • Gaming the Schedule
Purchase Options

Add to Wishlist

More Program Information

Why Lorman?

Over 38 years and 1.4 million customers worth of experience providing continuing education. Our passion is providing you world-class training to help you succeed in business and as a professional.

Credits

Live Webinar Registration

  • AIA (Pending)
     
  • AK ENG 1.0
     
  • This program is applicable for professional development hours through the Alaska State Board of Registration for Architects, Engineers and Land Surveyors. Professional development hours: 1.0.
     
  • AL ENG
     
  • This program is applicable for professional development hours through the Alabama Board of Licensure for Professional Engineers and Professional Land Surveyors. Please note: The Alabama Board of Licensure for Professional Engineers and Professional Land Surveyors does not preapprove courses.
     
  • FL ENG 1.3
     
  • This course has been approved for 1.3 PDHs by the Florida Board of Professional Engineers in the Areas of Practice.
     
  • GA ENG
     
  • This program is applicable for professional development hours through the Georgia State Board of Registration for Professional Engineers.
     
  • IA ENG
     
  • This program is applicable for professional development hours for engineers. Please refer to Chapter 3, 193C IAC.
     
  • ID ENG 1.0
     
  • This program is applicable for 1.0 professional development hours through the Idaho Board of Professional Engineers and Professional Land Surveyors.
     
  • IL ENG 1.0
     
  • This program is applicable for 1.0 professional development hours through the Illinois Society for Professional Engineers.* *Please check the rules and regulations in your state for compliance.
     
  • IN ENG 1.3
     
  • This program is applicable for 1.3 professional development hours through the Indiana State Board for Professional Engineers.
     
  • KS ENG 1.0
     
  • This program is applicable for 1.0 professional development hours for engineers.* *Please check the rules and regulations in your state for compliance.
     
  • LA ENG
     
  • The Louisiana Professional Engineering and Land Surveying Board (LAPELS) no longer approves providers or courses. Lorman Education Services believes that this course is worth 1.0 PDH(s). According to LAPELS' rules, It will be the responsibility of the licensee to determine if a Course/Activity offered by an unapproved sponsor/provider is an Acceptable Activity.
     
  • MD ENG 1.0
     
  • Lorman Education Services is a board approved sponsor with the Maryland Board of Professional Engineers. This course qualifies for 1.0 professional development hours.
     
  • ME ENG 1.0
     
  • This program is applicable for a maximum of 1.0 hours toward the annual PDH requirement. Please note: The State of Maine Professional Engineers Registration Board does not pre-approve courses for professional development credit.
     
  • MI ENG 1.0
     
  • This course is applicable for 1.0 professional development hours for engineers in Michigan through the Michigan Department of Licensing and Regulatory Affairs Corporations, Securities & Commercial Licensing Bureau.* *Please check the department rules and requirements for compliance.
     
  • MN ENG 1.0
     
  • This course is applicable for a maximum of 1.0 hours toward the PDH requirement for engineers. Please note: The Minnesota State Board of Registration for Engineers has final authority on the acceptance of individual courses.
     
  • MO ENG 1.0
     
  • This course is applicable for 1.0 PDH's through the Missouri Board for Professional Engineers.
     
  • MS ENG
     
  • This course is applicable for professional development hours through the Mississippi State Board of Registration for Professional Engineers.
     
  • ND ENG 1.0
     
  • The North Dakota State Board of Registration for Engineers and Land Surveyors does not pre-approve courses or providers. This course may be applicable for professional development hours in your state. Please check your rules and requirements for compliance.
     
  • NE ENG
     
  • This course is applicable for professional development hours for engineers if the course is continuing engineering education for you.* *Please check the rules and requirements in your state for compliance.
     
  • NH ENG 1.0
     
  • This course is applicable for 1.0 professional development hours for engineers.* *Please check the rules and requirements in your state for compliance. The New Hampshire Board of Engineers has final authority on granting approval.
     
  • NJ ENG 1.0
     
  • Lorman Education Services is authorized as a provider to offer courses through the New Jersey Board of Professional Engineers. This course is applicable for 1.0 CPC credits for engineers. * *Please check the NJ State rules and requirements for compliance.
     
  • NM ENG 1.0
     
  • This course is applicable for 1.0 professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • NV ENG 1.0
     
  • This course is applicable for 1.0 professional development hours through the Nevada State Board of Engineering and Land Surveyors.* *Please check the rules and requirements in your state for compliance.
     
  • OH ENG
     
  • This course is applicable for ethics continuing education credit for engineers through the Ohio State Board of Licensure for Professional Engineers provided it is a relevant managerial, ethical or technical topic relevant to the practice of engineering or surveying
     
  • OK ENG
     
  • This course is applicable for professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • OR ENG
     
  • This course is applicable toward engineering continuing education hours in Oregon, please refer to your rules and laws.
     
  • PA ENG 1.3
     
  • This program is applicable for 1.3 PDHs for engineers through the Pennsylvania State Board of Professional Engineers, Land Surveyors and Geologists.* *Please check the rules and requirements in your state for compliance.
     
  • SC ENG 1.0
     
  • This course is applicable for 1.0 hours toward the PDH requirement for engineers through the South Carolina Board of Registration for Professional Engineers.* *Please check the rules and requirements in your state for compliance.
     
  • SD ENG
     
  • This course is applicable for professional development hours for engineers in South Dakota.* *Please check the rules and requirements in your state for compliance.
     
  • TN ENG
     
  • This course is applicable for professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • TX ENG
     
  • This course is applicable for professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • UT ENG
     
  • This course is applicable for professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • VA ENG 1.0
     
  • This program is applicable for 1.0 hours of continuing education through the Board for Architects, Professional Engineers, Land Surveyors, Certified Interior Designers and Landscape Architects (APELSCIDLA BOARD).* *Please check the rules and requirements in your state for compliance.
     
  • VT ENG
     
  • This course is applicable for professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • WI ENG 1.0
     
  • This course is applicable for a maximum of 1.0 hours toward the PDH requirement for engineers.* *The Wisconsin Engineer Section has final authority on the acceptance of individual courses and providers.
     
  • WV ENG 1.0
     
  • This course is applicable for 1.0 professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     

This program does NOT qualify, nor meet the National Standard for NASBA accreditation.

OnDemand Course

This course was last revised on December 19, 2022.

Call 1-866-352-9540 for further credit information.

  • AIA 1.0
     
  • Lorman Education Services is a registered provider of AIA-approved continuing education under Provider Number J2016. This course is approved for 1.0 Learning Unit hour(s). Prerequisite: None, Program Level: Intermediate: Advanced Preparation: None All registered AIA CES Providers must comply with the AIA Standards for Continuing Education Programs. Any questions or concerns about this provider or this learning program may be sent to AIA CES ([email protected] or (800) AIA 3837, Option 3). This learning program is registered with AIA CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. AIA continuing education credit has been reviewed and approved by AIA CES. Learners must complete the entire learning program to receive continuing education credit. AIA continuing education Learning Units earned upon completion of this course will be reported to AIA CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.
     
  • AK ENG 1.0
     
  • This Ondemand program is applicable for professional development hours through the Alaska State Board of Registration for Architects, Engineers and Land Surveyors. Professional development hours: 1.0. *Please check the rules and requirements in your state for compliance.
     
  • AL ENG
     
  • This Ondemand program is applicable for professional development hours through the Alabama Board of Licensure for Professional Engineers and Professional Land Surveyors.* *Please check the rules and requirements in your state for compliance.
     
  • AR ENG
     
  • This Ondemand program is applicable for 1.0 professional development hours.* *Please check the rules and requirements in your state for compliance.
     
  • FL ENG 1.3
     
  • This course has been approved for 1.3 PDHs by the Florida Board of Professional Engineers in the Areas of Practice.
     
  • GA ENG
     
  • This Ondemand program is applicable through the Georgia State Board of Registration for Professional Engineers.for 1.0 professional development hours.* *Please check the rules and requirements in your state for compliance.
     
  • IA ENG
     
  • This Ondemand program is applicable for professional development hours for engineers. Please refer to Chapter 3, 193C IAC.*
     
  • ID ENG 1.0
     
  • This Ondemand program is applicable for 1.0 professional development hours through the Idaho Board of Professional Engineers and Professional Land Surveyors.* *Please check the rules and requirements in your state for compliance.
     
  • IL ENG 1.0
     
  • This program is applicable for 1.0 professional development hours through the Illinois Society for Professional Engineers.* *Please check the rules and regulations in your state for compliance.
     
  • IN ENG 1.3
     
  • This Ondemand program is applicable for 1.3 professional development hours through the Indiana State Board for Professional Engineers.* *Please check the rules and requirements in your state for compliance.
     
  • KS ENG 1.0
     
  • This program is applicable for 1.0 professional development hours for engineers.* *Please check the rules and regulations in your state for compliance.
     
  • KY ENG 1.0
     
  • This Ondemand program is applicable for 1.0 professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • LA ENG
     
  • The Louisiana Professional Engineering and Land Surveying Board (LAPELS) no longer approves providers or courses. Lorman Education Services believes that this course is worth 1.0 PDH(s). According to LAPELS' rules, It will be the responsibility of the licensee to determine if a Course/Activity offered by an unapproved sponsor/provider is an Acceptable Activity.
     
  • MD ENG 1.0
     
  • Lorman Education Services is a board approved sponsor with the Maryland Board of Professional Engineers. This course qualifies for 1.0 professional development hours.
     
  • ME ENG 1.0
     
  • This ondemand program is applicable for a maximum of 1.0 hours toward the annual PDH requirement. Please note: The State of Maine Professional Engineers Registration Board does not pre-approve courses for professional development credit.* *Please check the rules and requirements in your state for compliance.
     
  • MN ENG 1.0
     
  • This course is applicable for a maximum of 1.0 hours toward the PDH requirement for engineers. Please note: The Minnesota State Board of Registration for Engineers has final authority on the acceptance of individual courses.
     
  • MO ENG 1.5
     
  • This ondemand course is applicable for 1.5 professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • MS ENG
     
  • This ondemand course is applicable for professional development hours through the Mississippi State Board of Registration for Professional Engineers.* *Please check the rules and requirements in your state for compliance.
     
  • MT ENG 1.0
     
  • This ondemand course is applicable for 1.0 professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • NC ENG 1.0
     
  • This program may qualify for up to 1.0 professional development hour(s) for engineers. Please note: The North Carolina Board of Examiners for Engineers and Surveyors does not require that licensees take their CE from a Board approved Sponsor. The onus is on the licensee to make the determination of whether a course or activity has a purpose or objective which will maintain, improve, or expand the skills and knowledge relevant to the licensee's field of practice.
     
  • ND ENG 1.0
     
  • The North Dakota State Board of Registration for Engineers and Land Surveyors does not pre-approve courses or providers. This course may be applicable for professional development hours in your state. Please check your rules and requirements for compliance.
     
  • NE ENG
     
  • This course is applicable for professional development hours for engineers if the course is continuing engineering education for you..* *Please check the rules and requirements in your state for compliance.
     
  • NH ENG 1.0
     
  • This course is applicable for 1.0 professional development hours for engineers.* *Please check the rules and requirements in your state for compliance. The New Hampshire Board of Engineers has final authority on granting approval.
     
  • NJ ENG 1.0
     
  • Lorman Education Services is authorized as a provider to offer courses through the New Jersey Board of Professional Engineers. This course is applicable for 1.0 CPC credits for engineers. * *Please check the NJ State rules and requirements for compliance.
     
  • NM ENG 1.0
     
  • This course is applicable for 1.0 professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • NV ENG 1.0
     
  • This course is applicable for 1.0 professional development hours through the Nevada State Board of Engineering and Land Surveyors.* *Please check the rules and requirements in your state for compliance.
     
  • OH ENG
     
  • This ondemand course is applicable for continuing education credit for engineers through the Ohio State Board of Licensure for Professional Engineers provided it is a relevant managerial, ethical or technical topic relevant to the practice of engineering or surveying.* *Please check the rules and requirements in your state for compliance
     
  • OK ENG
     
  • This course is applicable for professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • OR ENG
     
  • This course is applicable toward engineering continuing education hours in Oregon, please refer to your rules and laws.
     
  • PA ENG 1.3
     
  • This program is applicable for 1.3 PDHs for engineers through the Pennsylvania State Board of Professional Engineers, Land Surveyors and Geologists.* *Please check the rules and requirements in your state for compliance.
     
  • SC ENG 1.0
     
  • This course is applicable for 1.0 hours toward the PDH requirement for engineers through the South Carolina Board of Registration for Professional Engineers.* *Please check the rules and requirements in your state for compliance.
     
  • SD ENG
     
  • This course is applicable for professional development hours for engineers in South Dakota.* *Please check the rules and requirements in your state for compliance.
     
  • TN ENG
     
  • This course is applicable for professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • TX ENG
     
  • This Ondemand course is applicable for professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • UT ENG
     
  • This course is applicable for professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • VA ENG 1.0
     
  • This program is applicable for 1.0 hours of continuing education through the Board for Architects, Professional Engineers, Land Surveyors, Certified Interior Designers and Landscape Architects (APELSCIDLA BOARD).* *Please check the rules and requirements in your state for compliance.
     
  • VT ENG
     
  • This course is applicable for professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • WI ENG 1.0
     
  • This course is applicable for a maximum of 1.0 hours toward the PDH requirement for engineers.* *The Wisconsin Engineer Section has final authority on the acceptance of individual courses and providers.
     
  • WV ENG 1.0
     
  • This course is applicable for 1.0 professional development hours for engineers.* *Please check the rules and requirements in your state for compliance.
     
  • WY ENG 1.3
     
  • This course is applicable for 1.3 professional development hours for Wyoming engineers.* *Please check the rules and requirements in your state for compliance.
     

To earn each credit Lorman offers through the OnDemand learning platform, you need to watch 100% of the program. Also, for certain credits you will need to fulfill additional requirements which will be displayed on the "credits" tab when viewing the course.

  • Those applying for AIA and HRCI must view 100% of the program and answer the questions following the program.

This program does NOT qualify, nor meet the National Standard for NASBA accreditation.

Who should attend?

This live webinar is designed for construction and project managers, engineers, presidents, vice presidents, owners, architects, controllers, accountants, and contract managers.

Purchase Options

Add to Wishlist

More Program Information

Why Lorman?

Over 38 years and 1.4 million customers worth of experience providing continuing education. Our passion is providing you world-class training to help you succeed in business and as a professional.

Faculty

Bill Haydt, Esq.

Bill Haydt, Esq.

Trauner Consulting Services, Inc.

  • Managing Principal, Shareholder at Trauner Consulting Services, Inc.
  • Qualified expert in construction scheduling, delay analysis, and damages
  • Has drafted various project delivery procurements and contracts for a large agency, including Design-Bid, and CMAR procurements/contracts
  • Expertise lies in the areas of construction claims preparation and evaluation, development and review of critical path method (CPM) schedules, delay analysis, training, and dispute resolution
  • Certified and award-winning instructor for Federal Highway Administration’s National Highway Institute courses, including Managing Highway Contract Claims: Analysis and Avoidance, and has provided CPM scheduling services to contractors and owners on a variety of projects, including bridge, highway, educational, and hotel projects
  • Has presented seminars, webinars, and construction claims-related presentations for private firms and public agencies across the country
  • J.D. Degree, Temple University James E. Beasley School of Law; B.A. Degree in Civil Engineering and Architectural Engineering, Drexel University
  • Can be contacted at [email protected] or 215-814-6400
Purchase Options

Add to Wishlist

More Program Information

Why Lorman?

Over 38 years and 1.4 million customers worth of experience providing continuing education. Our passion is providing you world-class training to help you succeed in business and as a professional.

All of your training, right here at Lorman

All of your training, right here at Lorman.

Pay once and get a full year of unlimited training in any format, any time!

  • OnDemand Courses
  • Live Webinars
  • MP3 Downloads
  • Course Manuals
  • Executive Reports
  • White Papers and Articles

Additional benefits include:

  • State Specific Credit Tracker
  • All-Access Pass Course Concierge

Questions? Call 877-296-2169 to speak with a real person.

Sign Up Today
With This Course

Access to all training products for one year
$699/year

Unlimited Lorman Training

With the All-Access Pass there is no guessing what you will need for your yearly training budget. $699 will cover all of your training needs for an entire year!

Easy Registrations

Once you purchase your All-Access Pass you will never be any further than one-click away from attending any Lorman training course.

Invest in Yourself

You haven't gotten to where you are professionally by luck alone; it's taken a lot of hard work and training. Invest in yourself with the All-Access Pass.

Product ID: 412181
Published 2022, 2025
Purchase Options

Register today before this event fills.