Project delays, especially on commercial projects can lead to substantial loss of productivity which can lead to litigation. In the event this occurs, having detailed documentation through procedures acceptable by the court will be advantageous. This white paper discusses techniques and methods that can be used to effectively measure and document construction delays.
- Techniques and methods for analyzing delays
- How to use a CPM schedule to evaluate delays
- How to prove a delay claim using a CPM schedule
- Ways to recover from delays and lost productivity
You can Login to access if you are already registered.
Thank You!
Download White PaperMore Program Information
