Understand the importance of delay analysis and avoid inaccurate and manipulated data that can lead to deceiving results.
Understand the importance of delay analysis and avoid inaccurate and manipulated data that can lead to deceiving results. Some of the most common causes of delay on construction projects range from poor weather to budget shortages, to poor scheduling. All of these, if not handled properly, could result in serious financial losses claimed by either the owner or the contractor. To solve these disputes, in-depth analysis is undoubtedly necessary. Given that delays are common and that the use of scheduling tools and technology has improved incredibly, one might think that delay analysis would be relatively simple and straightforward - but it’s not! Can delay analysis be a valuable tool or is it merely black magic? This topic will discuss the reasons how delay analysis has become a complex and subjective process and why inaccurate and manipulated data can lead to deceiving results.
Learning Objectives
- You will be able to define delay analysis.
- You will be able to recognize the value of a properly completed delay analysis.
- You will be able to discuss the issues with scheduling software.
- You will be able to explain how a delay analysis is done.
Add to Wishlist
Credit
More Program Information
Why Lorman?
Over 37 years and 1.4 million customers worth of experience providing continuing education. Our passion is providing you world-class training to help you succeed in business and as a professional.
Agenda
Overview of Delay Analysis | |
|
|
Methods: The Dark Arts | |
|
|
The Problems With Scheduling Software | |
|
|
What Should Be Done | |
|
|
Add to Wishlist
Credit
More Program Information
Why Lorman?
Over 37 years and 1.4 million customers worth of experience providing continuing education. Our passion is providing you world-class training to help you succeed in business and as a professional.
Credits
Live Webinar Registration
- AIA 1.0
- Lorman Education Services is a registered provider of AIA-approved continuing education under Provider Number J2016. This course is approved for 1.0 Learning Unit hour(s). Prerequisite: None, Program Level: Intermediate: Advanced Preparation: None
All registered AIA CES Providers must comply with the AIA Standards for Continuing Education Programs. Any questions or concerns about this provider or this learning program may be sent to AIA CES ([email protected] or (800) AIA 3837, Option 3). This learning program is registered with AIA CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. AIA continuing education credit has been reviewed and approved by AIA CES. Learners must complete the entire learning program to receive continuing education credit. AIA continuing education Learning Units earned upon completion of this course will be reported to AIA CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.
- AR CLE 1.0
- This course has been approved for 1.0 hours of CLE by the Arkansas CLE Board.
- Arizona CLE 1.0
- The State Bar of Arizona does not approve or accredit CLE activities for the Mandatory Continuing Legal Education requirement. This activity may qualify for up to 1.0 hours toward your annual CLE requirement for the State Bar of Arizona.
- CA MCLE 1.0
- Lorman Business Center, LLC. is a State Bar of California approved MCLE sponsor and this course qualifies for 1.0 CLE hours of participatory credit.
- CT CLE 1.0
- Neither the Connecticut Judicial Branch nor the Commission on Minimum Continuing Legal Education approve or accredit CLE providers or activities. This course has been approved for CLE credit in jurisdictions aside from CT and therefore it automatically meets the content and delivery requirements in Connecticut. Credit is based on a 60 minute credit hour and shall be awarded as follows: 1.0 CLE credit(s).
- HI CLE 1.0
- This program was approved by the Hawaii State Board of Continuing Legal Education for 1.0 VCLE credit hours.
- MN CLE 1.0 (Pending)
- This program has been submitted to the Minnesota Board of Continuing Legal Education. Approval pending.
- NH MCLE 1.0
- NH MCLE does not approve or accredit CLE activities for the NH Minimum CLE requirement. Lorman Education Services believes this course meets the requirement of NH Supreme Court Rule 53 and may qualify for CLE credit(s). Program Length: 60 Minutes.
- NJ CLE 1.3
- This program has been approved by the Board on Continuing Legal Education of the Supreme Court of New Jersey for 1.3 hours of total CLE credit.
- PA CLE 1.0
- This program has been approved by the Pennsylvania Continuing Legal Education Board for 1.0 hours of substantive law, practice and procedure CLE credit.
- RI CLE 1.0
- This program has been approved by the Rhode Island Mandatory Continuing Legal Education Commission for 1.0 hours of CLE credit.
- VT CLE 1.0
- This program has been approved by the Mandatory Continuing Legal Education Board of Vermont for 1.0 hours of CLE credit.
- WI CLE 1.0
- This program has been approved by the Board of Bar Examiners for 1.0 hours for use toward the Wisconsin Mandatory CLE requirement.
- WV MCLE 1.3
- This program has been approved by the West Virginia State Bar MCLE Commission for 1.3 MCLE hours.
- AK ENG 1.0
- This program is applicable for professional development hours through the Alaska State Board of Registration for Architects, Engineers and Land Surveyors. Professional development hours: 1.0.
- AL ENG
- This program is applicable for professional development hours through the Alabama Board of Licensure for Professional Engineers and Professional Land Surveyors. Please note: The Alabama Board of Licensure for Professional Engineers and Professional Land Surveyors does not preapprove courses.
- FL ENG 1.3
- This course has been approved for 1.3 PDHs by the Florida Board of Professional Engineers in the Areas of Practice.
- GA ENG
- This program is applicable for professional development hours through the Georgia State Board of Registration for Professional Engineers.
- IA ENG
- This program is applicable for professional development hours for engineers. Please refer to Chapter 3, 193C IAC.
- ID ENG 1.0
- This program is applicable for 1.0 professional development hours through the Idaho Board of Professional Engineers and Professional Land Surveyors.
- IL ENG 1.0
- This program is applicable for 1.0 professional development hours through the Illinois Society for Professional Engineers.*
*Please check the rules and regulations in your state for compliance.
- IN ENG 1.3
- This program is applicable for 1.3 professional development hours through the Indiana State Board for Professional Engineers.
- KS ENG 1.0
- This program is applicable for 1.0 professional development hours for engineers.*
*Please check the rules and regulations in your state for compliance.
- LA ENG
- The Louisiana Professional Engineering and Land Surveying Board (LAPELS) no longer approves providers or courses. Lorman Business Center, LLC. feels that this course is worth 1.0 PDH(s). According to LAPELS' rules, It will be the responsibility of the licensee to determine if a Course/Activity offered by an unapproved sponsor/provider is an Acceptable Activity.
- MD ENG 1.0
- Lorman Business Center, LLC. is a board approved sponsor with the Maryland Board of Professional Engineers. This course qualifies for 1.0 professional development hours.
- ME ENG 1.0
- This program is applicable for a maximum of 1.0 hours toward the annual PDH requirement. Please note: The State of Maine Professional Engineers Registration Board does not pre-approve courses for professional development credit.
- MI ENG 1.0
- This course is applicable for 1.0 professional development hours for engineers in Michigan through the Michigan Department of Licensing and Regulatory Affairs Corporations, Securities & Commercial Licensing Bureau.*
*Please check the department rules and requirements for compliance.
- MN ENG 1.0
- This course is applicable for a maximum of 1.0 hours toward the PDH requirement for engineers. Please note: The Minnesota State Board of Registration for Engineers has final authority on the acceptance of individual courses.
- MO ENG 1.0
- This course is applicable for 1.0 PDH's through the Missouri Board for Professional Engineers.
- MS ENG
- This course is applicable for professional development hours through the Mississippi State Board of Registration for Professional Engineers.
- ND ENG 1.0
- The North Dakota State Board of Registration for Engineers and Land Surveyors does not pre-approve courses or providers.
This course may be applicable for professional development hours in your state. Please check your rules and requirements for compliance.
- NE ENG
- This course is applicable for professional development hours for engineers if the course is continuing engineering education for you.*
*Please check the rules and requirements in your state for compliance.
- NH ENG 1.0
- This course is applicable for 1.0 professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance. The New Hampshire Board of Engineers has final authority on granting approval.
- NJ ENG 1.0
- Lorman Business Center, LLC. is authorized as a provider to offer courses through the New Jersey Board of Professional Engineers.
This course is applicable for 1.0 CPC credits for engineers. *
*Please check the NJ State rules and requirements for compliance.
- NM ENG 1.0
- This course is applicable for 1.0 professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- NV ENG 1.0
- This course is applicable for 1.0 professional development hours through the Nevada State Board of Engineering and Land Surveyors.*
*Please check the rules and requirements in your state for compliance.
- OH ENG
- This course is applicable for ethics continuing education credit for engineers through the Ohio State Board of Licensure for Professional Engineers provided it is a relevant managerial, ethical or technical topic relevant to the practice of engineering or surveying
- OK ENG
- This course is applicable for professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- OR ENG
- This course is applicable toward engineering continuing education hours in Oregon, please refer to your rules and laws.
- PA ENG 1.3
- This program is applicable for 1.3 PDHs for engineers through the Pennsylvania State Board of Professional Engineers, Land Surveyors and Geologists.*
*Please check the rules and requirements in your state for compliance.
- SC ENG 1.0
- This course is applicable for 1.0 hours toward the PDH requirement for engineers through the South Carolina Board of Registration for Professional Engineers.*
*Please check the rules and requirements in your state for compliance.
- SD ENG
- This course is applicable for professional development hours for engineers in South Dakota.*
*Please check the rules and requirements in your state for compliance.
- TN ENG
- This course is applicable for professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- TX ENG
- This course is applicable for professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- UT ENG
- This course is applicable for professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- VA ENG 1.0
- This program is applicable for 1.0 hours of continuing education through the Board for Architects, Professional Engineers, Land Surveyors, Certified Interior Designers and Landscape Architects (APELSCIDLA BOARD).*
*Please check the rules and requirements in your state for compliance.
- VT ENG
- This course is applicable for professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- WI ENG 1.0
- This course is applicable for a maximum of 1.0 hours toward the PDH requirement for engineers.*
*The Wisconsin Engineer Section has final authority on the acceptance of individual courses and providers.
- WV ENG 1.0
- This course is applicable for 1.0 professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- CPE 1.2
- Lorman Education Services is registered with the National Association of State Boards of Accountancy (NASBA) as a sponsor of continuing professional education on the National Registry of CPE Sponsors. State boards of accountancy have final authority on the acceptance of individual courses for CPE credit. Complaints regarding registered sponsors may be submitted to the National Registry of CPE Sponsors through its web site: www.nasbaregistry.org. For more information regarding administrative policies such as complaint and refund, please contact our offices at 866-352-9539. CPE Credit: Maximum Credit Hours: 1.2 each session (based on a 50 minute credit hour). You must attend at least 50 minutes to obtain credit. Field of Study: . Prerequisite: . Level of Knowledge: Intermediate. Teaching Method: Seminar/Lecture. Advance Preparation: None. Delivery Method: Group Internet Based. Please refer to the information in this brochure for outline, course content and objectives. Upon completion of this course, you will receive a certificate of attendance. Final approval of a course for CPE credit belongs with each state's regulatory board.
Please note: In order to receive CPE credit for this course you MUST use the streaming audio option, as well as enable and complete the required progress checks.
OnDemand Course
This course was last revised on March 27, 2020.
Call 1-866-352-9540 for further credit information.
- AIA 1.5
- Lorman Education Services is a registered provider of AIA-approved continuing education under Provider Number J2016. This course is approved for 1.5 Learning Unit hour(s). Prerequisite: None, Program Level: Intermediate: Advanced Preparation: None
All registered AIA CES Providers must comply with the AIA Standards for Continuing Education Programs. Any questions or concerns about this provider or this learning program may be sent to AIA CES ([email protected] or (800) AIA 3837, Option 3). This learning program is registered with AIA CES for continuing professional education. As such, it does not include content that may be deemed or construed to be an approval or endorsement by the AIA of any material of construction or any method or manner of handling, using, distributing, or dealing in any material or product. AIA continuing education credit has been reviewed and approved by AIA CES. Learners must complete the entire learning program to receive continuing education credit. AIA continuing education Learning Units earned upon completion of this course will be reported to AIA CES for AIA members. Certificates of Completion for both AIA members and non-AIA members are available upon request.
- AK ENG 1.5
- This Ondemand program is applicable for professional development hours through the Alaska State Board of Registration for Architects, Engineers and Land Surveyors. Professional development hours: 1.5.
*Please check the rules and requirements in your state for compliance.
- AL ENG
- This Ondemand program is applicable for professional development hours through the Alabama Board of Licensure for Professional Engineers and Professional Land Surveyors.*
*Please check the rules and requirements in your state for compliance.
- AR ENG
- This Ondemand program is applicable for 1.5 professional development hours.*
*Please check the rules and requirements in your state for compliance.
- FL ENG 1.8
- This course has been approved for 1.8 PDHs by the Florida Board of Professional Engineers in the Areas of Practice.
- GA ENG
- This Ondemand program is applicable through the Georgia State Board of Registration for Professional Engineers.for 1.5 professional development hours.*
*Please check the rules and requirements in your state for compliance.
- IA ENG
- This Ondemand program is applicable for professional development hours for engineers. Please refer to Chapter 3, 193C IAC.*
- ID ENG 1.5
- This Ondemand program is applicable for 1.5 professional development hours through the Idaho Board of Professional Engineers and Professional Land Surveyors.*
*Please check the rules and requirements in your state for compliance.
- IL ENG 1.5
- This program is applicable for 1.5 professional development hours through the Illinois Society for Professional Engineers.*
*Please check the rules and regulations in your state for compliance.
- IN ENG 1.8
- This Ondemand program is applicable for 1.8 professional development hours through the Indiana State Board for Professional Engineers.*
*Please check the rules and requirements in your state for compliance.
- KS ENG 1.0
- This program is applicable for 1.0 professional development hours for engineers.*
*Please check the rules and regulations in your state for compliance.
- KY ENG 1.5
- This Ondemand program is applicable for 1.5 professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- LA ENG
- The Louisiana Professional Engineering and Land Surveying Board (LAPELS) no longer approves providers or courses. Lorman Business Center, LLC. feels that this course is worth 1.5 PDH(s). According to LAPELS' rules, It will be the responsibility of the licensee to determine if a Course/Activity offered by an unapproved sponsor/provider is an Acceptable Activity.
- MD ENG 1.5
- Lorman Business Center, LLC. is a board approved sponsor with the Maryland Board of Professional Engineers. This course qualifies for 1.5 professional development hours.
- ME ENG 1.5
- This ondemand program is applicable for a maximum of 1.5 hours toward the annual PDH requirement. Please note: The State of Maine Professional Engineers Registration Board does not pre-approve courses for professional development credit.*
*Please check the rules and requirements in your state for compliance.
- MN ENG 1.0
- This course is applicable for a maximum of 1.0 hours toward the PDH requirement for engineers. Please note: The Minnesota State Board of Registration for Engineers has final authority on the acceptance of individual courses.
- MO ENG 2.0
- This ondemand course is applicable for 2.0 professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- MS ENG
- This ondemand course is applicable for professional development hours through the Mississippi State Board of Registration for Professional Engineers.*
*Please check the rules and requirements in your state for compliance.
- MT ENG 1.5
- This ondemand course is applicable for 1.5 professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- NC ENG 1.5
- Lorman Business Center, LLC. is an approved sponsor of the North Carolina State Board of Examiners for Engineers and Surveyors. This course qualifies for 1.5 professional development hours for engineers.
- ND ENG 1.5
- The North Dakota State Board of Registration for Engineers and Land Surveyors does not pre-approve courses or providers.
This course may be applicable for professional development hours in your state. Please check your rules and requirements for compliance.
- NE ENG
- This course is applicable for professional development hours for engineers if the course is continuing engineering education for you.*
*Please check the rules and requirements in your state for compliance.
- NH ENG 1.5
- This course is applicable for 1.5 professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance. The New Hampshire Board of Engineers has final authority on granting approval.
- NJ ENG 1.0
- Lorman Business Center, LLC. is authorized as a provider to offer courses through the New Jersey Board of Professional Engineers.
This course is applicable for 1.0 CPC credits for engineers. *
*Please check the NJ State rules and requirements for compliance.
- NM ENG 1.5
- This course is applicable for 1.5 professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- NV ENG 1.5
- This course is applicable for 1.5 professional development hours through the Nevada State Board of Engineering and Land Surveyors.*
*Please check the rules and requirements in your state for compliance.
- OH ENG
- This ondemand course is applicable for continuing education credit for engineers through the Ohio State Board of Licensure for Professional Engineers provided it is a relevant managerial, ethical or technical topic relevant to the practice of engineering or surveying.*
*Please check the rules and requirements in your state for compliance
- OK ENG
- This course is applicable for professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- OR ENG
- This course is applicable toward engineering continuing education hours in Oregon, please refer to your rules and laws.
- PA ENG 1.8
- This program is applicable for 1.8 PDHs for engineers through the Pennsylvania State Board of Professional Engineers, Land Surveyors and Geologists.*
*Please check the rules and requirements in your state for compliance.
- SC ENG 1.5
- This course is applicable for 1.5 hours toward the PDH requirement for engineers through the South Carolina Board of Registration for Professional Engineers.*
*Please check the rules and requirements in your state for compliance.
- SD ENG
- This course is applicable for professional development hours for engineers in South Dakota.*
*Please check the rules and requirements in your state for compliance.
- TN ENG
- This course is applicable for professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- TX ENG
- This Ondemand course is applicable for professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- UT ENG
- This course is applicable for professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- VA ENG 1.5
- This program is applicable for 1.5 hours of continuing education through the Board for Architects, Professional Engineers, Land Surveyors, Certified Interior Designers and Landscape Architects (APELSCIDLA BOARD).*
*Please check the rules and requirements in your state for compliance.
- VT ENG
- This course is applicable for professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- WI ENG 1.5
- This course is applicable for a maximum of 1.5 hours toward the PDH requirement for engineers.*
*The Wisconsin Engineer Section has final authority on the acceptance of individual courses and providers.
- WV ENG 1.5
- This course is applicable for 1.5 professional development hours for engineers.*
*Please check the rules and requirements in your state for compliance.
- WY ENG 1.8
- This course is applicable for 1.8 professional development hours for Wyoming engineers.*
*Please check the rules and requirements in your state for compliance.
To earn each credit Lorman offers through the OnDemand learning platform, you need to watch 100% of the program. Also, for certain credits you will need to fulfill additional requirements which will be displayed on the "credits" tab when viewing the course.
- Those applying for AIA and HRCI must view 100% of the program and answer the questions following the program.
This program does NOT qualify, nor meet the National Standard for NASBA accreditation.
Who should attend?
This live webinar is designed for project managers, contractors, subcontractors, developers, principals, owners, suppliers, architects, engineers, lenders, attorneys, accountants, and other construction professionals.
Add to Wishlist
Credit
More Program Information
Why Lorman?
Over 37 years and 1.4 million customers worth of experience providing continuing education. Our passion is providing you world-class training to help you succeed in business and as a professional.
Faculty
Bryan Van Lenten, P.E.
HKA Global
- Director in the office of HKA Global
- 20 years of experience in structural design, project management, and claims analysis
- Conducts regular seminars and workshops on delay analysis and project management
- Has taught claims avoidance and management classes to DOTs around the country
- B.S. degree in civil engineering, Drexel University
- Can be contacted at 267-831-2885 or [email protected]
Rocco R. Vespe, P.E.
HKA Global
- Principal in the Philadelphia HKA Global office
- Has more than 40 years of experience in the construction industry including 20 years as a general contractor followed by more than 20 years as a claims consultant and testifying expert on project management, construction management, cost estimating, schedule and delay analysis
- Conducts regular seminars and workshops on numerous construction management, change, change orders and claims management
- Author of several publications related to the areas of construction management, change, change orders and claims management
- Professional engineer, NJ, PA, MD, CT, MA, FL
- Member of the Construction Management Association of America
- B.S. degree in civil engineering, Drexel University
- Can be contacted at [email protected]
Add to Wishlist
Credit
More Program Information
Why Lorman?
Over 37 years and 1.4 million customers worth of experience providing continuing education. Our passion is providing you world-class training to help you succeed in business and as a professional.
All of your training, right here at Lorman.
Pay once and get a full year of unlimited training in any format, any time!
- OnDemand Courses
- Live Webinars
- MP3 Downloads
- Course Manuals
- Executive Reports
- White Papers and Articles
Additional benefits include:
- State Specific Credit Tracker
- All-Access Pass Course Concierge
Questions? Call 877-296-2169 to speak with a real person.
Access to all training products for one year
$699/year
Unlimited Lorman Training
With the All-Access Pass there is no guessing what you will need for your yearly training budget. $699 will cover all of your training needs for an entire year!
Easy Registrations
Once you purchase your All-Access Pass you will never be any further than one-click away from attending any Lorman training course.
Invest in Yourself
You haven't gotten to where you are professionally by luck alone; it's taken a lot of hard work and training. Invest in yourself with the All-Access Pass.